Outlast Fabrics for B2B Procurement: 7 Questions Every Buyer Should Ask
Textile Notes

Outlast Fabrics for B2B Procurement: 7 Questions Every Buyer Should Ask

2026-07-22 by Jane Smith

Textile Notes

Outlast Fabrics for B2B Procurement: 7 Questions Every Buyer Should Ask

I manage fabric purchasing for a mid-size uniform manufacturer — roughly $300k annually across 6 vendors. When we started evaluating Outlast's temperature-regulating fabrics in late 2024, I had a lot of practical questions that weren't answered by the glossy brochures. Here's what I learned the hard way, so you don't have to.

1. Is Outlast fabric actually worth the premium?

Short answer: depends on your end use. We tested Outlast's fleece against a standard mid-weight fleece for a winter jacket line. The Outlast version kept workers more comfortable during temperature swings (warehouse floor to cold outdoor loading bay). But it cost about 25% more per yard.

If your client's employees are in fluctuating environments, the premium buys real comfort — fewer complaints, longer wear without layering. For stable climate use? Probably overkill. (Note to self: document this ROI calculation next time.)

2. What kind of lead times should I expect?

As of Q1 2025, Outlast's standard lead time for custom-dyed fleece was 8–10 weeks. That's not unusual for technical textiles, but it caught us off guard for a rush project. If I remember correctly, our first sample order took 6 weeks just for development.

For stock colors? Faster — around 4–5 weeks. But don't expect commodity speed. Plan ahead. Period.

3. Are rush fees actually worth paying?

In March 2024, we paid $800 extra for a 3-week rush on Outlast denim for a trade show — the alternative was missing a $20,000 order. The fabric arrived on time, but the rush was a scramble on their end, and color matching wasn't perfect (Delta E around 3.5 vs. our target of 2.0).

Was it worth it? For the deadline, yes. But I'd budget for standard lead times next time and skip the accelerated route unless the penalty for delay is bigger than the rush premium. Unexpected circumstances — they happen.

4. How reliable is their color matching?

Outlast uses standard Pantone references, but you need to request a physical strike-off before production. On our first large order (2,000 yards of a custom blue), the production run came back slightly warmer than the lab dip — maybe Delta E 2.8 instead of 1.5. We approved it after comparison, but only because it was within our tolerance (we set Delta E < 3.0 for non-critical workwear).

Industry standard for brand-critical colors is Delta E < 2.0 (Pantone guidelines). If your client is strict, build in an extra week for color approval.

5. Can I customize webbing and trims to match?

Yes — Outlast offers custom webbing (up to 2" width, various weaves) and they can match your fabric colors. We ordered 500 yards of custom grosgrain for jacket zipper pulls. The minimum was 300 yards, which was fine for our volume. (Smaller buyers might find that high — check before budgeting.)

Lead time for custom webbing was 6–7 weeks as of late 2024. Coordinate it with your main fabric order to avoid mismatched delivery.

6. What about shrinkage and durability?

On Outlast's performance denim, we tested shrinkage per AATCC 135: 3 wash cycles showed ~2% shrinkage in length, 1% in width — better than the 5% we see on some basic denims. Tensile strength (ASTM D5034) was above 350 N, solid for workwear.

But here's the catch: the temperature-regulating coating can degrade if washed with fabric softeners or high heat. We now put a care label warning on every garment — saved us a lot of potential returns (ugh, learned that one the hard way after a batch of claims).

7. Should I consolidate orders with Outlast or split across vendors?

This worked for us, but our situation was specific: we ordered fleece, denim, and webbing from Outlast in one consolidated shipment. It simplified logistics and invoicing (one PO, one delivery date). But it also meant that if anything went wrong, everything was delayed together.

If you're dealing with unpredictable demand spikes (e.g., seasonal fashion), splitting between Outlast for core technical fabrics and a faster commodity supplier for basics might be smarter. The question isn't whether to consolidate — it's what risk you're willing to carry. We chose consolidation for cost savings, and it worked. Your mileage may vary if your volumes are smaller or deadlines tighter.

These insights were accurate as of Q1 2025. Textile pricing and lead times change fast — verify with Outlast directly before committing to budgets.

Back to Blog
Jane Smith

I’m Jane Smith, a senior content writer with over 15 years of experience in the packaging and printing industry. I specialize in writing about the latest trends, technologies, and best practices in packaging design, sustainability, and printing techniques. My goal is to help businesses understand complex printing processes and design solutions that enhance both product packaging and brand visibility.